Ski resorts Savoie
Savoie: planned lifts
All planned lifts in the Department of Savoie
Overview: planned ski lifts in the Department of Savoie
Lift projects at ski resorts in the Department of Savoie (renewal, development and integration)
Total: 18
3 7 5 3
Add lifts and cable cars? Please report here
See also:
New lifts 2025/2026
Savoie: planned ski lifts
- Savoie – limit to
Tourism regions:
Districts:
Savoie – switch toValleys:
Mountain ranges:
Parks:
Other:
1-9 out of 9 ski resorts
6pers. High speed chairlift (detachable)
Length: 1082 m
Carrying capacity/hour: 2800
Manufacturer: Poma
People mover
Carrying capacity/hour: 1500
Manufacturer: FICAP
People mover
Carrying capacity/hour: 1500
Manufacturer: FICAP
12pers. Gondola lift (monocable circulating ropeway)
Length: 1543 m
Carrying capacity/hour: 2400
10pers. Gondola lift (monocable circulating ropeway)
Length: 775 m
Carrying capacity/hour: 900
Manufacturer: Poma
10pers. Gondola lift (monocable circulating ropeway)
Length: 2500 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Length: 1340 m
Carrying capacity/hour: 2400
4pers. Chairlift (fixed-grip)
Length: 1327 m
Carrying capacity/hour: 1800
Manufacturer: CCM Finotello
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
4pers. High speed chairlift (detachable)
Carrying capacity/hour: 2000
1-9 out of 9 ski resorts